![]() |
![]() |
|
|
Where to Buy What is your zip code? |
||
![]() |
![]() |
![]() |
![]() |
|
|
Rate the information on this page (1 = Least helpful - 5 = Most helpful) |
||
![]() |
![]() |
![]() |
![]() |
|
|
We're Here to Help How can we help? Please choose a category for immediate help. |
||
![]() |
![]() |
Indoor Comfort in Smoky Mtns Convention Center Provided by York Shipley, Trane and Taco Equipment![]() The Events Center's mechanical system was designed by I.C. Thomasson Associates, Inc. of Knoxville, a multidisciplinary engineering firm with additional offices in Nashville and Tampa. The heating plant is powered by two 250 HP York Shipley natural gas fire tube boilers, with hot water distribution flowing through a primary and secondary piping arrangement utilizing Taco pumps. There are also Taco air separators, suction diffusers, expansion tanks and multi-purpose valves in the mechanical room. Air distribution for the convention center is served by both constant and variable volume Trane air handling units. These are central station type units with chilled water coils, hot water coils, air blenders, airside economizers and 30 percent efficient filtration. ![]() A pair of 700 ton high efficiency Trane centrifugal chillers with variable speed drives and two induced draft, vertical discharge cross flow cooling towers make up the center's chiller plant. Like the heating plant the chiller plant is set up in a primary/secondary loop arrangement with a bypass line to hydraulically decouple its constant volume primary loop Taco FI Series chilled water distribution pumps. For the cooling tower, 50 HP Taco TA Double Suction Horizontal Split Case constant flow pumps circulate water through the chiller condenser. Taco 100 HP TA variable flow pumps distribute chilled water to two-way control valves serving the Trane air handling unit coils located throughout the facility. All air handling units, VAV terminals, chillers, boilers, pumps and fans are controlled by a Web-based DDC system also supplied by Trane. ![]() The York Shipley boilers and Taco pumps and related equipment components were supplied by Peacock Sales of Knoxville. Taco pumps and equipment were selected by the mechanical contractor on the project, Shoffner Mechanical, also of Knoxville. Since start-up last August the HVAC system has worked fine, minus any problems, according to Debbie Humes of I.C. Thomasson, the lead mechanical engineer on the project. Debbie credits Peacock Sales for their part in the project: "It's all in your rep. agency," she says. She also cites Taco equipment for its field reliability and durability: "Across many projects, we've never had a problem with Taco." Information supplied by Peacock Sales and Taco, Inc. |







